A private mobile network does not go live like a Wi-Fi network: it transmits on regulated frequencies, sometimes connects to the public telephone network and handles subscriber data. Five conditions must be secured before go-live. This guide reviews them, says who handles each one and places them in the project steps.
What is a private 4G/5G network?
A private 4G/5G network is a mobile network reserved for one organisation: its antennas, core network and SIM cards are dedicated to it. It follows the same 3GPP standards as operator networks, and works locally, even with no link to the outside world. It is used where the public network is missing or not enough: a disaster area, a field hospital, a remote industrial site, a major event. See our private 4G/5G networks services.
The five prerequisites in one table
| Prerequisite | Why it matters | Who handles it |
|---|---|---|
| Spectrum authorisation | Without it, the radio cannot transmit legally | The customer holds it; the provider prepares the file |
| Interconnection | Required to call or text public numbers | The customer and a licensed operator |
| Equipment approval | Type approval, import and export-control checks | The provider, with the customer |
| Site readiness | Access, physical security, power and mast | The customer |
| Data protection | Subscriber data and local legal obligations | The customer; the provider advises |
1. Spectrum authorisation
A mobile network transmits on frequencies whose use requires an authorisation. Each country has its regulator: in Morocco, the ANRT draws up the national frequency plan on behalf of the State. The authorisation is held by the organisation that operates the network, not by its supplier; the supplier prepares the technical file: band requested, antenna locations, area to cover. This is often what drives the schedule: the application starts on day one of the project.
2. Interconnection
Inside the private network, users call and text each other without depending on anyone. To reach public numbers, you need an interconnection agreement with a licensed operator, and the corresponding regulatory authorisation. Without that agreement, the network remains fully usable internally: voice, SMS, data and push-to-talk. Ask the question early: do you need to call the outside world, or only to coordinate your teams?
3. Equipment approval
Radio equipment and devices must be approved in the country where they are used. Importing them involves customs formalities, and some equipment is subject to export controls in its country of origin. These checks are made item by item, before the order.
4. Site readiness
A network needs an accessible, secure location, power and, for a permanent site, a mast. On a remote site, power is planned with the network: grid, solar panels, generator and batteries. The link to the outside world, over fibre, microwave or satellite, is studied at the same time: see hybrid backhaul.
5. Data protection
A mobile network handles subscriber data: identities, SIM cards, connection logs, sometimes location. Processing it falls under the law of the country; in Morocco, Law 09-08 governs personal data, under the supervision of the CNDP. Define who has access to this data, how long it is kept and how a lost device is disabled. Have these points validated by your legal counsel. On the technical side, see our cybersecurity services.
Who does what during the project?
| Step | The provider | The customer |
|---|---|---|
| Needs assessment and radio study | Leads | Provides site data |
| Spectrum authorisation | Prepares the file | Holds the authorisation |
| Devices and SIM cards | Supplies and configures | Provides the user list |
| Integration and lab tests | Leads | Attends the tests |
| On-site deployment and acceptance | Leads | Gives site access and signs off |
| Operations and maintenance | Leads, as an option | Or operates the network itself |
| Training | Leads | Names the people to train |
The steps, in order
- Assess: site survey, radio study, spectrum and regulatory check, sizing.
- Build and test: full configuration in the lab, then acceptance tests you can attend.
- Deploy: installation, commissioning, acceptance tests and user onboarding.
- Operate: supervision, maintenance, training and, when the time comes, extending the network.
Each step ends with a decision that belongs to you: go-ahead after the assessment, sign-off after the tests, final acceptance on site.
The checklist in brief
- The frequency band is identified and the authorisation request is filed.
- The need to call public numbers is settled; if needed, an operator is approached.
- Each piece of equipment is checked: approval, import, export controls.
- The site is ready: access, security, power, mast, link to the outside world.
- The rules on subscriber data are written and validated.
- Users, groups and priorities are listed.
- The people to train are named.
For a site to cover quickly, see the TacticalCase tactical network; for usage, see mission-critical communications. Our IT consulting can run the feasibility study. To talk it through, contact us.